Sökresultat:
659 Uppsatser om Cross beams. - Sida 1 av 44
Momentbärförmåga för semikompakta ståltvärsnitt av HSQ-balkar : En modell för interpolering mellan eurokodens klass 2 och 3
The current standards for design of steel beams are divided into four classes based on the slenderness of cross-sectional parts. Depending on the section class a beams load capacity is either determined by a plastic, elastic or a reduced elastic model. The division between cross-sections calculated by a plastic and an elastic model is today done in a very harsh way with no smooth transition. This leads to a large difference in the calculated resistance for the sections located near the class limits. Elasto-plastic sections are in the current situation calculated as purely elastic and their large plastic reserve is not considered in the current standards.
Fiberföstärkning av Limträbalkar
Glulam is a product that was engineered to make use of timber in a more efficient way. Bychoosing timber of similar quality and discarding natural defects during production, thedevelopment of a stronger cross-section is achieved.Carbon fiber is a relatively new material with a high tension capacity. This feature is used toexamine how the bending capacity of the beams improve by adhering carbon fiber laminateson the lower edge of the beamsThe strength of the material is tested with three experiments: carbon fiber on the bottom of thebeam (a), carbon fiber attached to the lower sides of the beam (b) and carbon fiber in thebeam, covered with a layer of wood (c)The results show that the first case, where the carbon fiber is attached to the bottom of thebeam, gave the best result with an increase in capacity of 59 % compared to the nonreinforcedcontrol. The other two cases also show an improvement in capacity, beam-type 3had a capacity increase of 47% and beam-type 4 increased with 25 %Tests were also made with glulam beams reinforced with fiberglass, but these tests were notanalyzed in depth because the purpose was to compare the capacity to carbon fiber. Thisbeam improved its capacity by 40.3%.The tests show that carbon fiber as a reinforcement material for glulam is a good choice whenthere is a requirement for stronger cross-sections in both new production and renovation ofold buildings.
Studentbostäder i trä med Prefab-teknik
The Results of this thesis was the creation of two designed house variants with a module toall the apartments. In addition till the first module there are three other modules ofapartments that can be put in the houses if it so needs. The house are volume prefabricatedand are placed on site in a way that it create an enclosure of the area which faces against thenature and car parks also lies hidden behind these houses.For the actual structure, a cross beam was created to carry the floor above and it is supportby all four walls. The structure between the first and the second floor has no "syll" butinstead there are two differently alternative to linking the floors in order so that it will notmove. The reason with this solution was that there will not be any subsidence when theforces from above are pressed down ward.
Experimentella och teoretiska uträkningar för skruv- och bäddhållfasthet för takinfästningar mot stålstomme
Lättelement located in Örnskoldsvik AB is one of Sweden's leading companies in the development of building elements in the form of roofs, walls and floors made ??out of light beams. The company has clients from Lund to Kiruna, and from Norway. This means that the elements have high standards when they have to take many different loads from wind and snow due to such wide geographic variation.The roof elements are structured so that the main body is made of light beams with an I?profile.
Vertikalarmering i tegelbalkar ur arbetsmiljöperspektiv
Statistics of occupational injuries show that bricklayers are among the most exposed, with heavy lifting by far the most common cause of long-term sick leave. Prefabricated brick beams create yet another risk of injuries that can be prevented by auxiliary equipment or alternative solutions. From articles, interviews with masons and from a survey carried out in conjunction with this report, it appears that there are frequently difficulties in the use of available means for lifting and handling. Previous studies on the subject of transverse reinforcement in masonry beams indicate a viable method for bridging large openings in masonry walls. This bachelor thesis delves into whether the idea could be realized in today's brick construction with a view to improving occupational health and safety.
Utveckling av golvlucka för hoppgropssystem i kommunal idrottshall
In this thesis a concept for floor hatches for foam pits has been developed. Since there is an existing solution that is powered by hydraulics and is expensive, the goal was to develop a cheaper solution, as simple as possible.A number of different concepts were developed and evaluated. A concept with five sections that are pulled to the side and stacked on each other was chosen as it was thought to have the lowest risk of crush injuries and to be easiest to manage and control. In the opening behind the foam mattress a lifting table is placed to regulate the height of the stacked sections.To be allowed to be installed in the floor of sports halls the sections must be dimensioned according to the construction standards for these types of buildings. Different dimensions of beams in steel and wood materials were evaluated and of those, who lived up to the requirements of the standard, a concept was chosen.
Crossmedia & Storytelling i Marknadsföringssyfte
This paper contains a study where we apply cross media and storytelling into the design process of a practical commercial campaign. The purpose is to learn more and deeper by using cross media and the ideal of storytelling practical. We applied a qualitative method for research of the project to provide a high-quality empirical work. The result shows that by using well-structured story early in the design process you will easily succeed with your cross media design..
Cross-suckling when sows are group housed during lactation : associations with sow productivity and behaviour
Cross-suckling, i.e. when an offspring nurses a female other than their own mother, occurs in pig production systems where sows are group housed during lactation. As production systems where several sows and their litters are housed together during lactation are getting more common, the need of knowledge regarding cross-suckling increases. The overall aims with this thesis was to investigate how sow behaviour and productivity are associated with the occurrence of cross-suckling, and to investigate consistency in sow nursing behaviour related to cross-suckling.
The study included information about the first 4 parities of 40 LxY sows kept in outdoor and indoor production environments. Sows were single housed the first 2 weeks after farrowing and group housed (4 or 5 sows per group) from 2 weeks after farrowing until weaning, 7 weeks after farrowing.
Bojkonstruktion
The division of Electricity at Uppsala University runs a project called Lysekil project, they have designed a buoy that uses the waves to create electric power from a generator attached to the bottom of the sea.Uppsala University is closely connected with the company Seabased and the university makes use of their facilities in Lysekil. When they designed the buoy issues occurred, the geometric design was flawed, brackets with a short shelf life and it is generally uneconomic.A study visit was done in Lysekil on Seabased facility. With this visit the project started, which is to improve the design of the buoy and the attachment of wires leading to the generator. In this project we have chosen to use a beam system with three beams that are attached to the buoy. Then a wire attached to a plate that sits between the beams will be leading to the generator. Two proposals for construction are created, what distinguishes them are the brackets between the beams and the buoy.From these constructions, the design that is considered most optimal for our project is chosen.All parts of the buoy have been modeled and the drawings are designed in ProEngineer software.The two constructions are compared with each other, but the whole focus is on the second and final structure. The report begins with an introduction describing Lysekil project, and a task description of our project.The project aims to produce an optimal buoy that will be easy to design, materials restrictive with good durability and an economical solution.Wave power true function has been studied, mechanical and finite element analysis of beams, buoy and plate design.This has been presented in this report, where in the various chapters can read more about the processes. Although the relevant facts and information on this project and buoy development is included.
Robotinteraktion på litet företag : Examensarbete Industriautomation
The division of Electricity at Uppsala University runs a project called Lysekil project, they have designed a buoy that uses the waves to create electric power from a generator attached to the bottom of the sea.Uppsala University is closely connected with the company Seabased and the university makes use of their facilities in Lysekil. When they designed the buoy issues occurred, the geometric design was flawed, brackets with a short shelf life and it is generally uneconomic.A study visit was done in Lysekil on Seabased facility. With this visit the project started, which is to improve the design of the buoy and the attachment of wires leading to the generator. In this project we have chosen to use a beam system with three beams that are attached to the buoy. Then a wire attached to a plate that sits between the beams will be leading to the generator. Two proposals for construction are created, what distinguishes them are the brackets between the beams and the buoy.From these constructions, the design that is considered most optimal for our project is chosen.All parts of the buoy have been modeled and the drawings are designed in ProEngineer software.The two constructions are compared with each other, but the whole focus is on the second and final structure. The report begins with an introduction describing Lysekil project, and a task description of our project.The project aims to produce an optimal buoy that will be easy to design, materials restrictive with good durability and an economical solution.Wave power true function has been studied, mechanical and finite element analysis of beams, buoy and plate design.This has been presented in this report, where in the various chapters can read more about the processes. Although the relevant facts and information on this project and buoy development is included.
Beräkningsmall för väggskivor enligt Eurokoder
The regulatory framework for constructional calculations in Sweden did expire In January the 1.st, 2011.Since then the constructional regulatory that originally were composed by Boverket (BKR) has been replaced by new common range (Eurocodes) for the entire European Union. This transition has led to changes in existing rules and standards regarding dimensioning area in Grids and has forced a need for updating to structural Engineers.The new calculation system has caused time-consuming studies of the new rules and a proper understanding of all the advice and regulations for the entire profession.This study has been carried out in cooperation with the firm "Knut Jönson Ingenjörs AB i Stockholm?, that has been affected by this transition as all other consulting firms. The firm has requested for a calculation method of wall beams according to Eurocodes. The study's focus is therefore to clarify the rules and guidelines regarding the design of wall beams according to the new regulation.
Två sidor om korset : En studie om olika nationalismer i Polen
In the 10th of April 2010 the Polish Presidential plane crashed outside of Smolensk in today?s Russia. 88 passengers and 6 crewmen died a tragic death, among them the President of the Republic of Poland, Lech Kaczy?ski. A national week of sorrow was proclaimed and citizens all over Poland went out on streets and markets to honor the newly deceased President.
Omega System Kalibrering: Strål X-Separation mätning och kalibrering
Micronic Laser Systems AB produces and develops machines for the photo mask production market. One of their products is the Omega machine which exposes photo masks using 5 laser beams simultaneously. It is important that the distance between the each laser beam, the x-separation, is the same. The x-separation is today measured by exposing a photo mask with a certain pattern and thereafter measured with a metrology system. This takes to much time and it is desired to find a faster method to measure the x-separation without loosing precision.The task for this master thesis is to improve an existing measurement method which uses a calibration mask.
Förslag till ombyggnation av klipp- och bockningsmaskin
This thesis work has been performed on request by SWT (Scandinavia WeldTech AB). SWT manufactures, develop and sell ready to assemble building systems for concrete rafter beam applications. The beams in this system consist of a u-beam that is welded to a flange. To be able to fill the beams with concrete there is holes in the beams top end. The holes are made in a ?punching machine?. These holes are cut out and the remaining steel piece is bent down in the u-beam.
Den moderna idrottshallen Funktionalismens lösning på fritidsproblemet
Uppsats för avläggande av filosofie kandidatexamen iKulturvård, Bebyggelseantikvariskt program15 hpInstitutionen för kulturvårdGöteborgs universitet2014:22.